Thursday, March 27, 2008

Lakehouse on March 21, 2008


These pictures were taken on March 21, and posted about a week later.

New railings are in place around front porch. Gravel has been spread to create level parking and entry area. Small area to the left (under the foyer bath window) and to the right, along the top of the terrace, have been left "rough" for future shrubbery plantings.


Garage with new layer of gravel. Building materials are still in evidence inside. Outside "acorn" lights are in place.
Posted by Picasa

1 comment:

Anonymous said...

Hello. This post is likeable, and your blog is very interesting, congratulations :-). I will add in my blogroll =). If possible gives a last there on my blog, it is about the Toner, I hope you enjoy. The address is http://toner-brasil.blogspot.com. A hug.