Newest view of the house from what will be the driveway! Garage is up, framed and roofed! Most windows and doors are in! Roof shingles are on main house, soon to be on all!
Garage is up, windows in, concrete flooring not down yet. Need to order garage doors soon!!
Landscaper arrived today to begin moving dirt to create two terraces that will ease slope down to the right side of the front of the house. First terrace will extend about 10 feet from porch to the right (where "black" waterproofing material stops), second terrace will be below master bath window to end of house. First terrace will curve outward towards driveway and end about where trees are shown on the right side of picture.
Front door and porch of house. Roof of covered porch will extend outwards to where board extends. Beams with stacked stone bases will hold up roof. Awaiting arrival of front door.
Monday, September 24, 2007
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment