Wednesday, July 18, 2007


View of corner of house from left upper side, taken from the edge of woods between house and road, with lake in background. To the left is the side wall of lower level, to the right is foundation wall of lower front of the house. When completed, the garage will be between point of this point and corner of foundation.
Posted by Picasa

View from upper side of house, looking at guest bedroom side.
Posted by Picasa
Posted by Picasa

View of rear corner of lower level, exercise room corner.
Posted by Picasa

View from lower side, in the gully, looking up towards the master bedroom side of house.
Posted by Picasa
View of construction from lakeside in mid-July. Foundation is growing!
Posted by Picasa

Wednesday, July 4, 2007


When finished (the house will be 3 stories tall, 3 1/2 in the great room), the rear corner will be to the right (between the two large trees), this will be part of the view from the downstairs recreation windows and main floor great room windows.
Posted by Picasa