A view of the front porch with the new flagstone in place; caramel colors coordinate with the stacked stone on outside of the porch.
Monday, February 4, 2008
The family room floor is being laid: clear ash in various widths and lengths. We now think that a dark floor, the same shade stain as the accent wood trim and staircase, and the ceiling, will make the room too dark. We are currently considering a clear varnish or lighter stain.
First view of the substantial staircase. Unfinished "raw" cedar took stain a little darker than the finished pine trim pieces, but the contrast is pleasing.
First look at the cedar railings along the edge of the loft. The exposed wood below the railing posts will also be stained.
Sunday, January 20, 2008
The dry stacked stone fireplace in the Great Room has been built! The tones of the colors compliment the stains of various woods wonderfully. The mantel is part of a wooden beam that matches the beams across the ceiling.
View of the front foyer and doorway. Wainscoting is awaiting stain, but trims are done. Floor will be slate rectangles in a random pattern.
Looking at the foyer and front door, with new wainscoting in place and ready to be stained. Cedar log supports are stained.
View of the kitchen from the Great Room bar area, across where the eating pennisula will be built. Ceiling is painted pale yellow/gold, and beams and trim are in place.
Looking into Great Room from kitchen area (across what will be the center island and the eating penninsula.)
Subscribe to:
Posts (Atom)
